Main Fuel Tanks, Fuel System
The fuel system includes the connection to the main tank, which is already installed on site for the entire plant, which in turn feeds buffer tanks – the daily tanks for each 6 generator units
Transformers
Power plant transformers are responsible for the adjustment between high voltage levels and low distribution voltage levels or between two different transmission voltages. Our step-up transformers increase the voltage in order to transmit electric current a long distance through the power grid.
Generator sets
We use a unique light modular building structure, specially designed and developed by us, which enables easier and faster time for the installation of the power plant as well as greater efficiency and cost saving during the Operation and Maintenance period
Daily Fuel Tank
SCADA System
As part of Controling and Monitoring System Each of our projects includes an advanced real time controlling and monitoring system, which is a cornerstone in our approach to site operation and maintenance